name: ts-rolling-eval description: | Run leakage-safe rolling-origin (walk-forward) baseline evaluation for time series and output deterministic artifacts (metrics, report, fold schedule). Use when forecasting evaluation must be reproducible and temporally valid. Do not use for execution or live trading actions.
TS Rolling Eval
Inputs
- Input CSV/Parquet path
ts_colandy_col- Optional:
id_col, horizon, min train size, step, seasonal length
Outputs
metrics.jsonreport.mdfolds.csv
Workflow
- Sort by time.
- Build rolling-origin folds with no overlap leakage.
- Evaluate baselines: last value, drift, optional seasonal-naive.
- Write deterministic artifacts.