Senior power-engineer playbook for planning and operations optimization problems. Use whenever Egret or PyPSA studies are infeasible, reserve-deficient, congested, too expensive, or heavily curtailed — including escalations from a tool skill's OPF, unit-commitment, or expansion run. Triggers on "OPF infeasible", "not enough reserve", "too much curtailment", or "why is this so expensive". Gives corrective actions — data fixes, simpler screening solves, flexibility, congestion relief — rather than only reporting optimization output.

Power-Agent By Power-Agent schedule Updated 6/10/2026

name: operations-planning-mitigation description: Senior power-engineer playbook for planning and operations optimization problems. Use whenever Egret or PyPSA studies are infeasible, reserve-deficient, congested, too expensive, or heavily curtailed — including escalations from a tool skill's OPF, unit-commitment, or expansion run. Triggers on "OPF infeasible", "not enough reserve", "too much curtailment", or "why is this so expensive". Gives corrective actions — data fixes, simpler screening solves, flexibility, congestion relief — rather than only reporting optimization output.

Operations and planning mitigation

Start with the failed or unsatisfactory optimization result and the constraint set that caused it.

Preferred action order

  1. Fix data quality first: ramps, minimum output, up or down times, reserve requirements, network limits, and time-series assumptions.
  2. Solve a simpler screening case before a larger one: DC before AC, dispatch before unit commitment, operations before expansion.
  3. Add flexibility: storage, demand response, fast-start units, or revised reserve products.
  4. Relieve congestion with topology, transmission expansion, or better siting.
  5. Relax constraints or add slack variables only with explicit penalties and a clear explanation.

Working rules

  • Do not call a system infeasible before checking data consistency.
  • Separate economic congestion from physical AC infeasibility.
  • Validate promising fixes in an AC tool when voltage or reactive limits matter.

Deliver

  • The main binding constraints or infeasibility cause.
  • The best near-term operational fix.
  • The longer-term planning measure if the issue persists.
Install via CLI
npx skills add https://github.com/Power-Agent/PowerSkills --skill operations-planning-mitigation
Repository Details
star Stars 45
call_split Forks 11
navigation Branch main
article Path SKILL.md
More from Creator