Perform a Computer Systems Validation (CSV) assessment following GAMP 5 methodology. Covers user requirements, risk assessment, IQ/OQ/PQ planning, traceability matrix creation, and validation summary reporting. Use when a new computerized system is being introduced in a GxP environment, when an existing validated system is undergoing significant change, when periodic revalidation is required, or when a regulatory inspection demands a validation gap analysis.

pjt222 By pjt222 schedule Updated 6/5/2026

name: perform-csv-assessment locale: wenyan-ultra source_locale: en source_commit: 82c77053 translator: "Julius Brussee homage — caveman" translation_date: "2026-04-26" description: > Perform a Computer Systems Validation (CSV) assessment following GAMP 5 methodology. Covers user requirements, risk assessment, IQ/OQ/PQ planning, traceability matrix creation, and validation summary reporting. Use when a new computerized system is being introduced in a GxP environment, when an existing validated system is undergoing significant change, when periodic revalidation is required, or when a regulatory inspection demands a validation gap analysis. license: MIT allowed-tools: Read Write Edit Bash Grep Glob metadata: author: Philipp Thoss version: "1.0" domain: compliance complexity: advanced language: multi tags: csv, gamp-5, validation, risk-assessment, iq-oq-pq, traceability

行 CSV 評

依 GAMP 5 險基法為受監境之計算系驗。

  • GxP 境引新系
  • 舊驗系大變
  • 期重驗
  • 巡備求驗隙析

  • :系述(名、用、商、版)
  • :用旨+監境(GxP 範)
  • :GAMP 5 軟類(1-5)
  • :現 URS
  • :商文(設、釋、SOP)
  • :舊驗文

一:定 GAMP 5 軟類

分類:

Category Type Example Validation Effort
1 Infrastructure software OS, firmware Low — verify installation
3 Non-configured product COTS as-is Low-Medium — verify functionality
4 Configured product LIMS with config Medium-High — verify configuration
5 Custom application Bespoke R/Shiny app High — full lifecycle validation

得: 類明賦+因錄。 敗: 類歧→默高類+錄因。

二:書 URS

立 URS 文+號求:

# User Requirements Specification
## System: [System Name] v[Version]
## Document ID: URS-[SYS]-[NNN]

### 1. Purpose
[Intended use statement]

### 2. Functional Requirements
| ID | Requirement | Priority | Source |
|----|-------------|----------|--------|
| URS-001 | System shall calculate BMI from height and weight inputs | Must | Regulatory SOP-xxx |
| URS-002 | System shall generate audit trail entries for all data changes | Must | 21 CFR 11.10(e) |
| URS-003 | System shall export results in PDF format | Should | User request |

### 3. Non-Functional Requirements
| ID | Requirement | Priority | Source |
|----|-------------|----------|--------|
| URS-010 | System shall respond within 3 seconds for standard queries | Should | Usability |
| URS-011 | System shall restrict access via role-based authentication | Must | 21 CFR 11.10(d) |

### 4. Data Integrity Requirements
[ALCOA+ requirements: Attributable, Legible, Contemporaneous, Original, Accurate]

### 5. Regulatory Requirements
[Specific 21 CFR Part 11, EU Annex 11, or other applicable requirements]

得: 諸求皆有獨號、優、源。 敗: 無清源/優之求→旗以待干係人審。

三:行險評

施 GAMP 5 險基(FMEA):

# Risk Assessment
## Document ID: RA-[SYS]-[NNN]

| Req ID | Failure Mode | Severity (1-5) | Probability (1-5) | Detectability (1-5) | RPN | Risk Level | Mitigation |
|--------|-------------|----------------|-------------------|---------------------|-----|------------|------------|
| URS-001 | Incorrect BMI calculation | 4 | 2 | 1 | 8 | Low | OQ test case |
| URS-002 | Audit trail entries missing | 5 | 3 | 3 | 45 | High | IQ + OQ + monitoring |
| URS-011 | Unauthorized access | 5 | 2 | 2 | 20 | Medium | OQ test + periodic review |

RPN = 重 × 概 × 察。

RPN Range Risk Level Testing Requirement
1–12 Low Basic verification
13–36 Medium Documented test case
37+ High Full IQ/OQ/PQ with retest

得: 各 URS 求皆有對應險評行。 敗: 未評之求→升驗主導前處。

四:定驗策(驗計)

# Validation Plan
## Document ID: VP-[SYS]-[NNN]

### Scope
- System: [Name] v[Version]
- GAMP Category: [N]
- Validation approach: [Prospective / Retrospective / Concurrent]

### Qualification Stages
| Stage | Scope | Applies? | Rationale |
|-------|-------|----------|-----------|
| IQ | Installation correctness | Yes | Verify installation, dependencies, configuration |
| OQ | Operational requirements | Yes | Verify functional requirements from URS |
| PQ | Performance under real conditions | [Yes/No] | [Rationale] |

### Roles and Responsibilities
| Role | Name | Responsibility |
|------|------|---------------|
| Validation Lead | [Name] | Plan, coordinate, approve |
| Tester | [Name] | Execute test scripts |
| System Owner | [Name] | Approve for production use |
| QA | [Name] | Review and sign-off |

### Acceptance Criteria
- All critical test cases pass
- No unresolved critical or major deviations
- Traceability matrix complete

得: 試行前諸干係人批驗計。 敗: 計未批勿行試。

五:立試程(IQ/OQ/PQ)

各驗階寫試本:

# Operational Qualification Protocol
## Test Case: TC-OQ-001
## Traces to: URS-001

**Objective:** Verify BMI calculation accuracy

**Prerequisites:**
- System installed per IQ protocol
- Test data set prepared

**Test Steps:**
| Step | Action | Expected Result | Actual Result | Pass/Fail |
|------|--------|-----------------|---------------|-----------|
| 1 | Enter height=180cm, weight=75kg | BMI displayed as 23.15 | | |
| 2 | Enter height=160cm, weight=90kg | BMI displayed as 35.16 | | |
| 3 | Enter height=0, weight=75kg | Error message displayed | | |

**Tester:** _________ Date: _________
**Reviewer:** _________ Date: _________

得: 諸中+高險求皆至少一試例。 敗: 行前補缺之試例。

六:立追溯陣

立 RTM、由各求經險評至試例:

# Traceability Matrix
## Document ID: TM-[SYS]-[NNN]

| URS ID | Requirement | Risk Level | Test Case(s) | Test Result | Status |
|--------|-------------|------------|--------------|-------------|--------|
| URS-001 | BMI calculation | Low | TC-OQ-001 | Pass | Verified |
| URS-002 | Audit trail | High | TC-IQ-003, TC-OQ-005 | Pass | Verified |
| URS-003 | PDF export | Low | TC-OQ-008 | Pass | Verified |
| URS-011 | Role-based access | Medium | TC-OQ-010, TC-OQ-011 | Pass | Verified |

得: 100% URS 求現於 RTM+鏈接試果。 敗: 任求無鏈試果→旗為驗隙。

七:書驗要報

# Validation Summary Report
## Document ID: VSR-[SYS]-[NNN]

### 1. Executive Summary
[System name] v[version] has been validated in accordance with [VP document ID].

### 2. Validation Activities Performed
| Activity | Document ID | Status |
|----------|-------------|--------|
| User Requirements | URS-SYS-001 | Approved |
| Risk Assessment | RA-SYS-001 | Approved |
| Validation Plan | VP-SYS-001 | Approved |
| IQ Protocol/Report | IQ-SYS-001 | Executed — Pass |
| OQ Protocol/Report | OQ-SYS-001 | Executed — Pass |
| Traceability Matrix | TM-SYS-001 | Complete |

### 3. Deviations
| Dev ID | Description | Impact | Resolution |
|--------|-------------|--------|------------|
| DEV-001 | [Description] | [Impact assessment] | [Resolution and rationale] |

### 4. Conclusion
The system meets all user requirements as documented in [URS ID]. The validation is considered [Successful / Successful with conditions].

### 5. Approval
| Role | Name | Signature | Date |
|------|------|-----------|------|
| Validation Lead | | | |
| System Owner | | | |
| Quality Assurance | | | |

得: 報引諸驗交付+清成/敗結。 敗: 偏差未決→報須言「條件」狀+CAPA 引。

  • GAMP 5 類賦+錄因
  • URS 有號求+優+源追溯
  • 險評涵諸 URS 求
  • 試行前驗計批
  • 試程有先決、步、預果、簽位
  • RTM 鏈各求至險+試果
  • 驗要報錄諸動、偏差、結
  • 諸文皆有獨號+版控

  • 過驗:類 5 力施於類 3 軟費資—力依險合
  • 缺追溯:求不貫至試例→隱隙
  • 無計而試:批驗計前行試→果無效
  • 忽非功能:安、性能、料整之求常忽
  • 靜驗:視驗為一次—變則重評

  • setup-gxp-r-project
  • write-validation-documentation
  • implement-audit-trail
  • validate-statistical-output
  • conduct-gxp-audit
Install via CLI
npx skills add https://github.com/pjt222/agent-almanac --skill perform-csv-assessment
Repository Details
star Stars 21
call_split Forks 2
navigation Branch main
article Path SKILL.md
More from Creator