name: Construction Meeting Prep and Action Tracking slug: construction_meeting_prep_and_action_tracking version: 0.1.0 status: draft category: residential_multifamily subsystem: residential_multifamily pack_type: workflow targets:
- claude_code
stale_data: |
Meeting cadence and attendee sets are overlay-driven. Action-item taxonomy drifts with
program structure.
applies_to:
segment: [middle_market]
form_factor: [garden, walk_up, wrap, suburban_mid_rise, urban_mid_rise]
lifecycle: [development, construction, renovation]
management_mode: [self_managed, third_party_managed, owner_oversight]
role: [construction_manager, estimator_preconstruction_lead, development_manager, asset_manager]
output_types: [checklist, memo, email_draft]
decision_severity_max: recommendation
references:
reads:
- reference/normalized/approval_threshold_defaults.csv writes: [] metrics_used:
- schedule_variance_days
- milestone_slippage_rate
- change_orders_pct_of_contract
- cost_to_complete
- punchlist_closeout_rate escalation_paths:
- kind: stale_action_item to: construction_manager -> asset_manager approvals_required: [] description: | Prepares weekly or biweekly construction-meeting packets (agenda, data summary, RFI and submittal log, COs, schedule status, safety) and tracks action items with owners and due dates. Closes the loop by updating status and surfacing stale items.
Construction Meeting Prep and Action Tracking
Workflow purpose
Reduce meeting time; increase meeting clarity. Produce the agenda, the data pack, and a clean action-item ledger. Follow up reliably.
Trigger conditions
- Explicit: "build the construction meeting pack", "agenda for OAC", "action item update".
- Implicit: scheduled meeting date approaching; open action items aging; new RFI or submittal.
- Recurring: weekly or biweekly per overlay.
Inputs (required / optional)
| Input | Type | Required | Notes |
|---|---|---|---|
| Prior meeting action items | table | required | open and closed |
| Current schedule state | record | required | |
| RFI and submittal log | table | required | |
| Open CO log | table | required | |
| Safety log | table | required | |
| Budget and CTC summary | record | required |
Outputs
| Output | Type | Shape |
|---|---|---|
| Meeting agenda | checklist |
topics, owner, time box |
| Data pack | memo |
KPIs, schedule, budget, RFI, CO, safety |
| Action-item ledger update | table | status, owner, due date |
| Action-item reminders | email_draft |
for stale items |
Required context
Asset_class, segment, form_factor, market, project.
Process
- Agenda compose. From overlay template + open items.
- Data pack compose. KPI rollup, schedule, budget, RFI, CO, safety.
- Action-item review. Close completed; age open; identify stale (past due).
- Reminder drafts. For each stale item, draft a reminder with owner and due-date nudge.
- Meeting follow-up. Post-meeting capture of new items and decisions.
- Confidence banner. References surfaced.
Metrics used
schedule_variance_days, milestone_slippage_rate, change_orders_pct_of_contract, cost_to_complete, punchlist_closeout_rate.
Reference files used
reference/normalized/approval_threshold_defaults.csv
Escalation points
- Stale action item: CM -> AM.
Required approvals
None by default; any decisions captured in meeting minutes that trigger approvals (e.g., scope change) route through relevant workflow.
Failure modes
- Meeting without action-item ledger. Fix: ledger is the backbone.
- Stale items never surfaced. Fix: aging view mandatory.
- Minutes without decisions captured. Fix: decisions separate from discussion in the data pack template.
Edge cases
- Absent owner for a critical item: escalate to next level in overlay.
- Item crossing multiple trades: cross-reference in ledger.
- Cancelled meeting: action-item cadence continues; asynchronous updates recorded.
Example invocations
- "Build the OAC pack for Willow Creek this Wednesday."
- "Stale action items across Riverbend construction."
- "Update the action ledger after Thursday's meeting."
Example outputs
Output — OAC meeting pack (abridged, Willow Creek)
Agenda. Safety, schedule, RFIs, submittals, COs, budget / CTC, punch, action items.
Data pack. KPI snapshot; schedule_variance_days and milestone_slippage_rate within band; RFI and submittal log counts; CO log with rows 10/11 status; safety log clean; CTC within overlay.
Action-item ledger. Closed 6 items; opened 3; aged 2 stale; reminder drafts prepared.
Confidence banner. approval_threshold_defaults@2026-03-31 (starter).