name: lidr-gate-evaluation
id: gate-evaluation
version: "1.3.0"
last_updated: "2026-06-10"
updated_by: "TL: Gate-evidence contract fix"
status: active
phase: 0
stage: anytime
owner_role: "PME"
automation: false
domain_agnostic: true
language_default: en
integrations: [tracking]
description: >
Generate standardized gate evaluation reports for SDLC phase transitions.
Tool-agnostic - works across all project tracking systems and methodologies.
Use for formal gate assessments, handoff package generation, compliance scoring.
Essential for maintaining SDLC governance and ensuring phase-gate quality standards.
Always use when transitioning between SDLC phases, always use for gate pass/fail decisions.
Do NOT use for individual task evaluation or informal progress checks.
Triggers on "gate evaluation", "phase transition", "gate assessment", "handoff package".
Output: English by default; artifact language follows the client language setting (see _shared/lidr/integrations/).
Audience: PME (conducts evaluations), PO/TL (receives results), QA/Security (provides sign-offs).
Gate Evaluation — SDLC Phase Transition Assessment
Essential for formal SDLC governance — this skill generates standardized gate evaluation reports that determine whether a project can advance to the next phase. Critical for maintaining quality gates and ensuring proper handoffs.
Triggers: "gate evaluation", "phase transition", "gate assessment", "handoff package", "advance gate"
Tools resolve via the central registry _shared/lidr/integrations/tool-registry.yaml; the active client binds concrete tools in clients/<CODE>.yaml.
Phase: Cross-cutting (Gates 0-7) | Language: English (default; configurable per client language setting) | Duration: 15-45min
Critical Success Workflow
This workflow is MANDATORY for every gate transition — ensures systematic evaluation of artifacts, checklists, coherence, and sign-offs.
Prerequisites (Required)
- ✅ All required artifacts for the current phase completed
- ✅ Phase-specific checklists validated
- ✅ Required sign-offs obtained
- ✅ Coherence validation completed
Execution Steps
- Load Gate Context — Identify the gate number, then load its evidence definition from
../../_shared/lidr/gate-evidence.yaml(gates.G<N>). This manifest is the source of truth for which artifacts satisfy the gate: BMad outputs (primary engine) + LIDR custom-skill outputs (gap-fillers). The gate verifies them — it never regenerates them. - Artifact Assessment — For each
bmad_evidenceandlidr_evidenceentry, evaluate existence (glob match) and content quality. BMad artifacts under_bmad-output/are read-only. - Checklist Validation — Verify completion of phase-specific quality criteria
- Coherence Analysis — Check cross-references and traceability between artifacts
- Sign-off Verification — Confirm required approvals are in place
- Generate Report — Create standardized gate evaluation with scoring and verdict
Input
Gate Specification:
- Gate number (0-7) → resolves to
gates.G<N>in../../_shared/lidr/gate-evidence.yaml - Project identifier (active CLIENT_CODE → resolves the
{client}path_vars) - Evidence manifest (
gate-evidence.yaml) — the per-gate BMad + LIDR evidence list
Output
Gate Evaluation Report using template templates/gate-evaluation.md:
- Weighted scoring across 4 dimensions (Artifacts 40%, Checklists 35%, Coherence 15%, Sign-offs 10%) — sourced from the manifest: Artifacts =
bmad_evidence+lidr_evidence, Checklists =checklist, Sign-offs =signoffs - PASS/CONDITIONAL/FAIL verdict with thresholds
- Action items for CONDITIONAL/FAIL results
- Handoff context for next phase
- Evidence documentation
Success Metrics
- Pass Rate: >85% of gates pass on first attempt
- Consistency: Standardized evaluation across all projects
- Traceability: Complete audit trail for governance
- Efficiency: <45min evaluation time per gate
Integration Points
- Commands: Used by
/lidr-advance-gate [N]for automated evaluation - Manifest: Reads
../../_shared/lidr/gate-evidence.yamlfor the per-gate evidence list (BMad artifacts + LIDR gap-fillers) - Skills: References artifacts from BMad (engine) + LIDR custom skills (governance/compliance/capacity)
- Governance: Feeds into project health dashboards and metrics
Changelog
| Version | Date | Author | Changes |
|---|---|---|---|
| 1.3.0 | 2026-06-10 | TL: Gate-evidence contract fix | Fixed dead /advance-gate → /lidr-advance-gate and dead docs/templates/ path → real template location in skill body + report template |
| 1.2.0 | 2026-06-09 | TL: lang+tool agnostic | Language to English-default-configurable; abstracted tracking (Jira) via tool-registry |
| 1.1.0 | 2026-06-09 | TL: LIDR Gate-over-BMad | Evidence sourcing now reads _shared/lidr/gate-evidence.yaml — gate verifies BMad artifacts (primary) + LIDR gap-fillers instead of phase-specific re-generation |
| 1.0.0 | 2026-04-06 | TL: epic-jira-cleanup | Initial skill creation — extracted from deprecated epic-jira |