f2s-doc-milestone

star 11

Generate a milestone document (`project-milestone-template`) from req-docs, git log, `.task`, and knowledge-topic semantics; triggers: f2s-doc-milestone、生成项目里程碑、里程碑、project milestone、generate milestone. A semantic scope may be appended after the command. This skill always uses a sub agent for generation and the main agent for verification, regardless of flow2spec.config orchestration switches

Lands-1203 By Lands-1203 schedule Updated 6/15/2026

name: f2s-doc-milestone description: Generate a milestone document (project-milestone-template) from req-docs, git log, .task, and knowledge-topic semantics; triggers: f2s-doc-milestone、生成项目里程碑、里程碑、project milestone、generate milestone. A semantic scope may be appended after the command. This skill always uses a sub agent for generation and the main agent for verification, regardless of flow2spec.config orchestration switches

Execution scope: read .Knowledge/template/project-milestone-template.md; write only .Knowledge/stock-docs/<scope-name>-milestones.md (no second path argument).

Orchestration (Fixed, Not Affected by Project Config)

This skill is not affected by subAgent, switchAgentVerification (or old key subAgentVerification) in flow2spec.config.json: regardless of whether they are true or false, always use the division below. It is forbidden to switch to "all main session" or "sub agent self-verifies and ends" because of config values.

Role Steps Responsibilities
Main agent 0, 3, 4 Read template and knowledge topic index, parse scope, dispatch sub agent, verify, revise if needed, reply to user
Sub agent 1, 2 Collect four sources, apply template, Write draft
  1. Main agent: Step 0 -> issue the "collection contract" -> sub agent executes Steps 1-2 and writes the draft.
  2. Main agent: Step 3 verifies against the four sources and the "important node checklist" (do not rewrite wholesale; fill gaps, correct errors, add "Pending Confirmation") -> Step 4 replies.
  3. The sub agent is forbidden from claiming "the milestone has been accepted as complete"; the final document is the version verified by the main agent.

Step 0 still Read("flow2spec.config.json") (satisfies the f2s-config-check preflight), but its subAgent / switchAgentVerification values must not change this skill's orchestration.

Sub-Agent Collection Contract (Main Agent Writes into the Prompt Before Dispatch)

Field Content
scope One sentence describing the user's semantic scope
outputPath stock-docs/<scope-name>-milestones.md
sources See "Four Sources" below; must include knowledge-topic semantics
template .Knowledge/template/project-milestone-template.md (do not write the template's top explanatory blockquote)
delivery Complete Markdown that can be directly Writen to outputPath
stagePolicy See "Stage Granularity" below; the contract must restate it in one sentence

Stage Granularity (Required, Write into the Contract)

Milestones Mx record only feature/capability changes: deliverables that are already implemented or verifiable in the current repository (or user-specified scope), such as modules/APIs/data models/domain behavior/knowledge routing, and must be supported by the four sources.

Do not write the following stage types as separate overview rows or standalone ## Mx · sections (do not invent them without four-source delivery support; even when delivery exists, do not split them into "pure testing / pure integration" stages):

  • Joint debugging, integration testing, UAT, regression, acceptance, test submission, launch checks (process-only, no functional diff)
  • Environment/ops-only actions (executing DDL, filling configs, release windows, cross-repo scheduling) with no feature delivery in this scope
  • Stages named "stabilization / engineering / wrap-up" whose substance is only the process work above

Merge rule: engineering changes within the same capability iteration (such as id type alignment, pagination format, locking and concurrency) are merged into the corresponding feature stage body, not written as a separate "joint debugging / testing / acceptance" stage.

Gap handling: if the four sources mention only pending joint debugging, pending acceptance, or missing environment setup without feature delivery in this scope, do not write a corresponding Mx. Add one sentence under Pending Confirmation if needed, and do not fill the overview table with "planned items".

Four Sources (Both Collection and Verification Must Cover Them)

Source What to Read How to Use in Milestones
req-docs In-scope .Knowledge/req-docs/*.md Requirement/design nodes, delivery summaries
git git log --no-merges, git tag -l, package.json version Timeline, major versions/tags, commit anchors
.task todo.json, active/, completed/ task.md, etc. Task closure, delivered steps
Knowledge topics (semantics) See "Topic Source" below Align with capabilities already registered in index/manifest and avoid missing stages that are already semantic in the knowledge base

Topic Source (Knowledge Semantics; Main Agent Step 0 Must Read, Sub Agent Step 1 Must Read)

  1. Read(".Knowledge/manifest-routing.json"): extract topicPaths, taskToTopicRules, and scope-related topicDependencies.
  2. Read(".Knowledge/index.md"): at least the "Topic Overview" table (topic id, applicable scenario, linked document summary).
  3. Read .Knowledge/topics/<topic>.md as needed: summaries related to the scope or manifest hits (do not enumerate the entire topics/ directory; read only topics named by manifest/index, usually no more than the table rows).
  4. Summarize topic semantics into a list of "capability/scenario nodes" for the sub-agent contract. Milestone stages must either cover them or explain related gaps under "Pending Confirmation".

Source information is for collection and verification only — do not write it into the generated document. The output must not contain a "Sources" line, topic file paths, or internal manifest names.

Input (Only One, Optional)

After the command name, the user may append one semantic scope (natural language):

User Intent Example Output Filename
Entire project (default) omitted / entire project / full project / 整个项目 / 全项目 project-milestones.md
One requirement or capability callback refactor / login module / 回调改造 / 登录模块 <summary>-milestones.md

Filename rule: suffix -milestones.md; entire project -> prefix project; single requirement -> semantic phrase or requirement title summary (keep concise).

Scope narrowing: filter the four sources by keyword, path, and date. If no scope is provided, all four sources are traceable in full (topic source reads full index table + manifest, and expands topics as needed).

Step 0: Preflight (Main Agent)

  1. Read("flow2spec.config.json") (do not use its subAgent / switchAgentVerification values to orchestrate this skill)
  2. Read(".Knowledge/template/project-milestone-template.md")
  3. Topic source (see above: manifest -> index topic table -> topic summaries as needed)
  4. Parse the scope -> determine default path stock-docs/<scope-name>-milestones.md.
  5. Similar-file check (required before writing): list existing *milestone*.md files under .Knowledge/stock-docs/ (including *milestone.md). If there is a file with the same target path or a semantically similar file (for example, another whole-project milestone such as project-milestones.md, or high overlap in prefix/scope keywords), ask the user first. Do not silently overwrite or invent a new filename:
    • Overwrite: keep the original path; the sub agent overwrites this file, and after verification it remains the final path.
    • Generate another copy: use a new path (recommended: scope summary + _YYYYMMDD + -milestones.md, or the user's specified <summary>-milestones.md), and update outputPath in the contract.
    • If no similar file exists, or only one file exists with exactly the target path and the user has already explicitly asked to "regenerate/overwrite" in this round, no further question is required; continue with the default path.
  6. Restate to the user: scope, final outputPath, and number of topics read. If a similar-file question was asked, wait for the user's choice before continuing.
  7. Assemble the "collection contract" (including final outputPath and topic node list) and dispatch the sub agent for Steps 1-2.

Step 1: Collect Sources (Sub Agent)

  • Complete four-source collection according to the contract. Git must compare tags and main version/semver transitions (based on this repository's git tag / package.json).
  • Topic semantics: check whether capabilities from manifest/index align with git/req/task in the same window. Put temporarily unaligned items into internal notes for "Pending Confirmation".

If sources are empty: still generate the document and explain gaps under "Pending Confirmation"; do not fill deliverables from training data.

Step 2: Apply Template and Write (Sub Agent)

Generation principle: write for readers, not internal tooling.

  1. Document header: title # (Scope Name) Milestones, scope, and updated date only. Do not write a Sources line, topic paths, manifest names, commit hashes, npm publish status, environment status, or any other internal information.
  2. Newest first: both the overview table and each ## Mx · section are ordered latest phase first (MN → … → M1). Each stage title must reflect a feature change; do not use "joint debugging / testing / acceptance" as a name (see "Stage Granularity").
  3. Each stage body: list delivered features only, one item per line, verifiable. Do not include timing details, process narration, or background context.
  4. Pending Confirmation: only list functional/delivery gaps or inconsistencies. Do not include internal operations, release, or environment status. Write "None" if there are no gaps.
  5. Do not write the template's top explanatory blockquote.
  6. Write to outputPath.

Step 3: Verify (Main Agent, Required)

After the sub agent writes the draft, the main agent must verify whether important nodes are wrong, missing, or over-merged.

  1. Reread four-source essentials: git tags/commits, req/task, and index topic table + read topics, then compare against the draft.
  2. Check against the important node checklist:
Category What to Check
Version / tag Major tags and package.json version transitions from the four sources are reflected in overview or Mx
Route/architecture turning point Major directory restructuring or technology-route replacement in the four sources is reflected separately or merged appropriately
Feature delivery Verifiable capabilities in req/git/task have corresponding stages in Mx
Knowledge topics If manifest/index exists: topics related to the scope are covered or listed under "Pending Confirmation"
Task closure If .task/ exists: archived tasks are reflected in related Mx
Traceable basis Each Mx deliverable can be traced to the four sources
Timeline Ordering is reasonable; same-window multi-version changes are split if needed
Ordering Overview table and all Mx sections are newest-first; reorder if not
Stage granularity No Mx consists only of joint debugging/testing/acceptance/environment work without feature delivery; if found, delete it or merge it into an adjacent feature stage
Internal information Document contains no Sources line, commit hashes, topic paths, or npm/environment status; remove if found
  1. Missing items -> add Mx (must be feature changes); errors -> correct according to the four sources; unknowns -> "Pending Confirmation" (do not replace unknowns with fake Mx).
  2. Only after verification or revision is complete may Step 4 run.

Step 4: Reply (Main Agent)

Report the disk path, stage count, one-sentence verification conclusion, and "Pending Confirmation" summary.

Forbidden Items

  • Do not use subAgent / switchAgentVerification to skip sub-agent generation or main-agent verification.
  • Do not dispatch a sub agent or Write before the user chooses "overwrite / generate another copy" when a similar milestone already exists in stock-docs/.
  • Do not use a second argument to change the output path (the path is determined by scope + similar-file choice). Do not write to req-docs.
  • Do not write deliverables without reading the four sources. Do not let the sub agent claim completion before verification.
  • Do not enumerate the entire matchers/ directory or all topics as a substitute for "manifest + index + topics as needed".
  • Do not use training data or milestone structures from other projects instead of the current repository's four sources. Do not write unrelated stock-docs documents outside this outputPath.
  • Do not create standalone joint debugging / integration testing / UAT / acceptance / pure environment-ops Mx stages. Do not write "planned item" stages when there is no four-source feature delivery.
Install via CLI
npx skills add https://github.com/Lands-1203/Flow2Spec --skill f2s-doc-milestone
Repository Details
star Stars 11
call_split Forks 3
navigation Branch main
article Path SKILL.md