name: pl-grant-write description: "Section-by-section Polish national grant writer. System-aware (Witkac/LSI/SOWA), applies grant-core writing patterns, indicator mapping, PL-specific terminology. Triggers: write wniosek krajowy, napisz FESL, napisz NOWEFIO, napisz FERS, fill polish grant form, wniosek krajowy."
PL Grant Write
Polish national grant application writer for EFS+, FESL, NOWEFIO, FERS, and other domestic funding programs.
Prerequisites
- grant-core skill MUST be loaded first (shared writing rules, forbidden words, naturalness patterns)
Capabilities
- System-aware writing — knows form structure for Witkac (NOWEFIO), LSI (FESL), SOWA (FERS), Generator NIW
- Section-by-section mode — writes one section at a time, respecting character limits per system
- Indicator mapping — maps project activities to ESF+ product/result/monitoring indicators
- PL terminology — uses correct Polish grant vocabulary (diagnoza, grupa docelowa, trwalosc, etc.)
- Participant lifecycle — full DKI-model document chain from recruitment to final evaluation
- Promotion compliance — NIW-CRSO and EU logo/acknowledgment rules
Workflow per section
- Identify which form system (Witkac/LSI/SOWA) and which section
- Check character limit for that section in that system
- Draft section content applying grant-core patterns
- Run forbidden words scan (from grant-core)
- Run naturalness check (from grant-core)
- Present final version with character count
Key rules files
rules/form-systems.md— submission system specifics (Witkac, LSI, SOWA, SL2021)rules/indicator-framework.md— ESF+ indicator system, SZOP requirementsrules/section-templates-pl.md— proven PL grant section structuresrules/participant-mgmt.md— participant lifecycle, 19 document templatesrules/promotion-rules.md— NIW-CRSO promotion and logo guidelines
Section writing order (typical)
- B.2 Cel projektu i krotki opis zalozen
- D.1 Diagnoza problemu / sytuacji
- D.2 Grupa docelowa
- E.1 Zadania w projekcie (zakres rzeczowy)
- B.5 Wskazniki produktu i rezultatu
- D.3 Ryzyka w projekcie
- D.4 Potencjal wnioskodawcy i partnera
- D.5 Zasady horyzontalne
- F Budzet projektu
- Zalaczeniki
Anti-patterns to avoid
- Generic descriptions without local data (always cite GUS, BDL, dane powiatowe)
- Copy-paste indicator definitions instead of project-specific measurement plans
- Ignoring SZOP type requirements when selecting indicators
- Using the same risk matrix across different applications
- Forgetting quarterly monitoring milestones in the timeline