rtl-p5a-functional-closure-policy

star 32

Policy for P5A functional closure. Defines hierarchy-level verification depth, coverage goals, and requirement traceability gates.

babyworm By babyworm schedule Updated 3/19/2026

name: rtl-p5a-functional-closure-policy description: "Policy for P5A functional closure. Defines hierarchy-level verification depth, coverage goals, and requirement traceability gates." user-invocable: false

Functional Verification Policy (P5A)

Scope

  • Module, block, and top functional closure.

Mandatory Checks

  • Multi-seed regression for functional stability
  • Coverage closure per project target
  • Requirement traceability matrix complete

Hard Gate

  • Functional FAIL blocks progression to silicon validation.

AC-Level P5A Closure (when applicable)

P5A functional closure includes AC coverage when structured acceptance_criteria exist:

During P5A internal verification (module/block checkpoints):

  • PARTIAL Critical/High ac_ids = WARNING (continue verification, attempt to upgrade)
  • UNTESTED Critical/High ac_ids = FAIL (must add tests before proceeding)

At P5A exit gate (gates P5B entry and ultimately P6):

  • All Critical/High ac_ids must have VERIFIED or FORMAL status
  • UNTESTED or PARTIAL Critical/High ac_ids → FAIL (blocks P5B/P6 entry; PARTIAL must be upgraded to VERIFIED or FORMAL)
  • NOT_VERIFIABLE ac_ids documented but excluded from gate

When no structured AC: existing closure gate applies.

Install via CLI
npx skills add https://github.com/babyworm/rtl-agent-team --skill rtl-p5a-functional-closure-policy
Repository Details
star Stars 32
call_split Forks 7
navigation Branch main
article Path SKILL.md
More from Creator