name: architecture-plan description: >- Turn approved architecture-design artifacts, with supporting review findings when present, into an incremental implementation/refactoring plan. Use when asked to plan a refactor, sequence remediation, or implement an approved target architecture. Produces a task-runner-compatible, verifiable plan that cites source findings, evidence, design decisions, contracts, or risks. NOT for applying changes (hand off to a mutator agent), designing target architecture (use architecture-design), or scoring (use architecture-scorecard).
Architecture plan
Derive an actionable, incremental implementation/refactoring plan from an approved design, with review findings as supporting context when present. The artifact is executable by an engineer, mutator agent, or task runner; the architect writes the plan and stops.
When to use
Use after an architecture design, when the user wants approved target
architecture implemented. For existing-code remediation, the default chain is
architecture-review → architecture-design → architecture-plan. Plan one
hotspot, boundary, module, or flow per plan unless a roadmap is explicitly
requested.
If there is no approved design artifact, recommend architecture-design first.
If there is no review report for existing-code remediation, recommend
architecture-review before design unless the user explicitly wants greenfield
target-state design.
Skill navigation
- Missing findings for an existing system: recommend
architecture-reviewfirst unless the user already supplied enough current evidence. - Missing approved target architecture: recommend
architecture-designbefore planning. - Current skill: use
architecture-planto sequence small, verifiable changes from an approved design, citing review findings as supporting rationale when present. - Next skill after implementation: run
architecture-reviewto verify the code now matches intended architecture and the plan's acceptance criteria.
Task list discipline
Maintain a visible task list for the planning flow. Track at least:
- Approved design artifact confirmed; supporting review report confirmed when present.
- Scope and first execution horizon selected.
- Safety net ordered before behavior-bearing changes.
- Executable task sections drafted.
- Verification and acceptance criteria attached.
- Handoff and re-review step recorded.
Keep task names outcome-based. Do not expose prompt or tool internals in task names.
Destination
When the user explicitly asks for a plan file and gives no destination, ask to
confirm the default path under docs/plans/ using a kebab-case slug from the
target, for example docs/plans/extract-auth-boundary.md. Create docs/plans/
only after the destination is confirmed. If the user only asks to generate or
create a plan, return it in the conversation unless they confirm a file path.
Use a user-specified path only when provided. If the user-specified path is
outside docs/plans/, state that the executor must be invoked with that exact
path or the plan must be copied/symlinked into the configured plans directory.
Procedure
Anchor to the source artifacts. Cite the approved design artifact plus decision, contract, risk, or module IDs each task addresses. Include source report finding/evidence IDs when the design came from a review. A task with no source rationale does not belong in the plan.
Use the plan template.
../../templates/plan.mdis the skeleton: Overview, Source artifact, Success criteria, Validation Commands, Implementation Steps with executable### Task N:sections, Acceptance criteria, Safety notes, Re-review. Put checkboxes only inside### Task N:or### Iteration N:sections; context sections must use plain bullets or prose.Resolve the destination. For file artifacts, use the user's path. If no path is provided, ask to confirm
docs/plans/<kebab-case-target>.mdbefore writing or creating directories. When the path is outsidedocs/plans/, include the exact execution path or the copy/symlink instruction in the handoff.Order for safety. Prefer characterization tests, seam creation, boundary repair, and fitness checks before cosmetic cleanup. Establish a safety net before changing behavior-bearing code.
Keep it incremental. No big-bang rewrites. Each executable task is small, independently committable, and independently verifiable. Keep the next execution horizon to five tasks or fewer before a re-review.
Make every task concrete. Each
### Task N:section includes:- Justification: source finding, evidence ref, design decision, contract, risk, or module responsibility.
- Files: planned file paths and what changes in each.
- Preconditions and postconditions.
- Impact commands: concrete
gitnexus impact <path-or-symbol>andgitnexus detect-changescommands when GitNexus is available; otherwise an explicit fallback such asgit diff --name-onlyand the missing-tool note. - Deterministic architecture checks: if archfit is configured, name the
existing gate status, the rule/config change when needed, and the focused
archfit checkorarchfit check --base <ref>command. For a new gate, state the violation should fail before the fix and pass after it. Otherwise name the missing config/tool gap. - Verification commands: concrete test, lint, type, or fitness commands for this task, not only whole-plan commands.
- Manual checks: plain bullets only, or
None. - Checkbox work items for executable implementation steps only.
Separate manual checks. Do not turn human review or judgment into checkboxes. Put those under
Manual checks:using plain bullets so task runners do not treat them as extra loop iterations.End with final verification and docs. The last executable task is a final verification/documentation task. It runs whole-plan validation, updates or explicitly rules out docs changes, records GitNexus
detect-changes, and records the scopedarchitecture-reviewfollow-up.Write safety notes. Flag irreversible steps, data migrations, and wide-blast-radius changes. State plainly that an engineer, mutator agent, or task runner executes the approved plan after approval.
Failure handling
- Missing approved design, unreadable artifact, or absent finding/evidence/
decision/contract refs: stop and ask for the missing source or run
architecture-design. Do not invent refs. - Missing
../../templates/plan.md: report the missing template and ask before using an inline fallback. - Requested rewrite with no cited finding, design decision, or risk behind it: decline that task and name the missing rationale.
- No concrete file list or verification command can be named for a task: split, narrow, or discard the task before writing the plan.
Output
Return or write a Markdown plan shaped like ../../templates/plan.md. When
writing a file with no path provided, use the confirmed default path
docs/plans/<kebab-case-target>.md. Include:
## Source artifact: approved design path or ID plus decision, contract, risk, or module IDs used; include supporting report finding/evidence IDs when present.## Success criteria: measurable outcomes tied to findings, score dimensions, design decisions, contracts, or module responsibilities. Use plain bullets, no checkboxes.## Validation Commands: concrete project-wide commands to run for the whole plan, including archfit check/delta commands when configured.## Implementation Steps: at most five executable### Task N:or### Iteration N:sections. Each task has justification, files, preconditions, postconditions, fitness gate, impact commands, verification commands, manual checks, and checkbox work items.- A final
### Task N: Final verification and documentationsection. ## Acceptance criteria: checks that prove the plan is complete. Use plain bullets, no checkboxes.## Safety notes: blast radius, irreversible steps, rollback notes, and the engineer/mutator/task-runner handoff.
Hard rules
- Every executable task cites a source finding, evidence ref, design decision, contract, risk, or module responsibility.
- Task headers must be
### Task N:or### Iteration N:;Nmay be an integer or a small variant such as2.5or2a. - Checkboxes must appear only under executable task/iteration headings.
- Generated plan files use the user-provided path, or a confirmed default path
under
docs/plans/<kebab-case-target>.md. - If a generated plan is outside
docs/plans/, the handoff must say how to run it by exact path or copy/symlink it into the configured plans directory. - Every task has a file list, fitness-gate status, and concrete per-task verification command.
- When archfit is configured, every boundary/coupling task names the archfit check or config/rule update that will make the improvement repeatable, including before-fail/after-pass expectation for new gates.
- Manual checks use plain bullets only.
- Every plan includes concrete GitNexus impact/detect-changes commands or an explicit missing-tool fallback.
- Incremental only — no rewrites the source artifact does not justify.
- The final executable task is verification/documentation/handoff.
- The plan must end with a re-review recommendation.
- The architect produces the plan and stops. Execution is someone else's job.